REFERANSLARIMIZ
Please note that;
All structural design works are recorded by chamber of civil engineers.
Hakan Gürses, Villa, Renovation and Extension, Güvercinlik
Renovation of the villa and construction of new extensions.
Scope of work; technical consultancy of structural strengthening applications and materials, build up architectural details and applications of all technical details on site, assign works to subcontractors, draw up contracts with subcontractors and suppliers, coordination of all construction works eg. mechanical, electrical, architectural and structural.
Project date: 2009
Gemibaşı Restaurant Renovation, Bodrum
Renovation of Old Stone House and building extension with steel structure project.
Scope of work; structural design, responsible of technical applications (TUS), technical consultancy of structural strengthening materials.
Project date: 2009
Sabiha Dagar Houses, Gümüşlük, Bodrum
Project includes two apartments, total construction closed area is 300 sqm.
Scope of work; structural design, responsible of technical applications (TUS)
Project date: 2008 - 2009
Mehmet Hilmi Helvacıoğlu, Mansion, Bodrum
Project includes a mansion with private swimming pool, garage building, gate house. Total construction closed area is 350 sqm.
Scope of work; structural design, responsible of technical applications (TUS), steel structure roof with walkway.
Project date: 2008
Devegözü Pınarı Villas, Gürece, Ortakent, Bodrum
Project includes two exclusive villas. Total construction closed area is 400 sqm.
Scope of work; structural design, responsible of technical applications (TUS).
Project date: 2008
Faysal Yağcı Houses, Turgutreis, Bodrum
Project includes two apartments, total construction closed area is 300 sqm.
Scope of work; structural design, responsible of technical applications (TUS)
Project date: 2007 - 2008
Denizhan Özdoğan Villa, Ortakent, Bodrum
Project includes a mansion.
Scope of work; structural design, responsible of technical applications (TUS).
Project date: 2007 - 2008
Nejat Bilgiç Villa, Bodrum
Renovation of Old Stone House and building extension project.
Scope of work; structural design, responsible of technical applications (TUS), technical consultancy of structural strengthening materials.
Project date: 2007- 2008
Sebiha Bilen Shopping Center, Bodrum
Project includes restaurant, shops and offices. Total construction closed area is 500 sqm.
Scope of work; structural design, responsible of technical applications (TUS)
Project date: 2007 - 2008
İbrahim Bilen Houses, Bodrum
Project includes two apartments, covered with natural stone, total construction closed area is 280 sqm.
Scope of work; structural design, responsible of technical applications (TUS)
Project date: 2007
Nesrin Yılmaz Villa, Bodrum
Renovation of Old Stone House and building extension project.
Scope of work; structural design, responsible of technical applications (TUS), technical consultancy of structural strengthening materials.
Project date: 2007
Meditinvest A.Ş., Valley Gardens Regency, Gökçebel, Yalıkavak, Bodrum
Project includes 18 apartments, swimming pool, tennis court. Total Construction closed area is 1680 sqm.
Scope of work; responsible of technical applications (TUS), material procurement, ensuring consistency and coordination of project with project architect, preparation of feasibility, preparation of progress reports, updating cash flow, preparation of monthly breakdown.
Project date: 2007 - 2009
L&M Properties, Arinna 4, Gündoğan, Bodrum
Project includes 36 exclusive apartments, swimming pool, club house. Total Construction closed area is 4100 sqm.
Scope of work; structural design, responsible of technical applications (TUS)
Project date: 2007
Murat Poyraz Villa, İçmeler, Bodrum
Project includes the mansion, private swimming pool, gate house and garage. Total Construction closed area is 400 sqm.
Scope of work; structural design, responsible of technical applications (TUS)
Project date: 2007
Meditinvest A.Ş., Woodland Regency, Konacık, Bodrum
Project includes 62 apartments and social buildings. Total Construction closed area is 4700 sqm.
Scope of work; responsible of technical applications (TUS), material procurement, ensuring consistency and coordination of project with project architect, preparation of feasibility, preparation of progress reports, updating cash flow, preparation of monthly breakdown.
Project date: 2007 - 2009
Meditinvest A.Ş., Seaview Regency Prestige, Küçükbük, Gündoğan, Bodrum
Meditinvest A.Ş. was established in 2005. The company partners are Bank Austria and Cumberland Properties. Bank Austria has been managed by UniCredit since 2007. Project includes 19 villas and social buildings. Total Construction closed area is 2850 sqm.
Scope of work; responsible of technical applications (TUS), material procurement, ensuring consistency and coordination of project with project architect, preparation of feasibility, preparation of progress reports, updating cash flow, preparation of monthly breakdown.
Project date: 2006 - 2007
Koleksiyon Mobilya, Bakraz Houses, Tilkicik, Yalıkavak, Bodrum
Koleksiyon Mobilya was founded by Faruk Malhan in 1972. His current and recent work includes the Bodrum Bakraz Housing project started in 2005, as Malhan leads all the architectural phases.
Project includes 28 villas and social buildings. Total Construction closed area is 5500 sqm.
Scope of work; planning construction period, obtaining adequate work hour by preparing Gantt chart of project
Project date: 2005 - 2006
M. Ömer Koç, Mansion, Dağbelen Village, Yalıkavak, Bodrum
Structural design of Fitness Center, Hamam, Squash court, Spa and winter pool.
Scope of work; Analyzing of steel structure, detail solutions of copper roof, responsible of technical application of steel structure construction, controlling sub-contractor works.
Total construction scope was 550 sqm. Total Construction area was 2700 sqm.
Project date: 2004
InterYatırım Branch Building Extension, Bodrum
Adding Basement Extension. Structural Design and Construction works; excavation, concrete works, backfilling, damp proofing, masonary, plaster; were scope of work. Total construction area was 110 sqm.
Project date: 2003
|